Friday 27 March 2015

Mail call

After much delay, they are finally here!  The Farish 4F 0-6-0 all purpose do anything loco.  I've been a bit selfish and have four, including one spilt form a box set.  You can read the numerous reviews in the mags and blogs, and I agree it is the best so far in RTR steam locos, even better than the recently released Farish Duchess (and I've got two of them)!
- Team Fowler shunt team
Why so many, so ask?  Because there was so many, 574 built between 1924-41!  The S&DJR had more than few and were often seen double heading with another 4F, a 2P, a BoB, or a black/Std 5 to name a few.  I've only run one of them so far, only because I got it back in January from the box split.  Haulage wise, it can manage 20 or so wagons or 4-6 coaches, which is more than enough for my requirements. The other three, which arrived today will have to wait as my 5yo son is have a sleep over tonite and we are making pizza and watching Star Wars and sleeping in the tent in the backyard this evening!
 
- lots of included detail 

Tuesday 17 March 2015

Sturminster Newton - Landscaping - part 4

Just a quick update.  Got lights, comprising:

  • 25mm PVC pipe with T-pieces and 90° angle elbows,
  • 4m of LED strip and associated powerpack, and
  • Trial and error.
All need to do now is tidy it up, add some connectors, paint and make it ease of use for transport.
- view from Butts pond.


Sunday 15 March 2015

Sturminster Newton - Landscaping - part 3


A bit late with this post, but work is continuing, and it is occurring both above and below the baseboards!  The work on the village scene moved ahead with the siting of the buildings (finally), and laying down of the road and the associated boxing and applying of the cobblestone roller.
 - Buildings and roads in place
- Road into station forecourt.
On the building side, I’ve use some old SD mouldings plaster cast buildings I had lying around.  They fit the scene and resemble the building that were found in the area.  I’ve use 1 ready to plonk Hornby Lyddle End building, which will serve as the post office, a scratch built card shop building and also a Severn models etch-brass shop kit. 
 - shop in progress
 - finished and ready for painting
- 50% good, but blue acrylic didn't quite work, so strip and start again.
This was a Kickstarter project from last year which got-up.  They are quite simple to build and the detail is great.  I’ve also built the stables which I intend to use within the station yard complex. 
- completed stable
I’m still pondering as to what the shops will be, but research has indicated a bike shop, butcher, drapery and general merchandise stores where at that end of town.
The paving was painstaking!  After laying the timber boxing and getting it level, I picked a nice 33°C day to lay the clay.  I did it in small sections, on a diluted PVA base to give it some adhesion.  I’m still a bit concerned how it will withstand movement. 
 - 1st section
 - drying and cracking commence
 - a village appears.
Time will tell, and the guys have tentatively booked me into the Toowoomba show at the end of May; that is a round trip journey of 145km.  As the clay dried I kept spraying with a small mist bottle and using a damp finger or paint brush filled in some of the minor cracks.  I learnt early on that to properly use the cobblestone roller that use must let the clay being to dry.  Rolling it too early, while still damp, cause the roller to slip and spin and the area turning into off-road adventure park.  Once finally dry, I applied some grey paint, in this case Tamiya grey texture paint, which gives the rougher surface.  The roads are not perfect, but what road would be in Dorset during the 1930-50’s?
On a past Turs UFO night the question of lighting was discussed.  This lead to the use of LED strips.  A quick visit to eBay and 5m of lights were purchased with associated electrical connections, all for a very reasonable price.  They arrived with a week and we had a play with them on the Thurs just past.  I now need to assemble some 25mm PVC pipe to mount them in.
- 5m roll of LEDs.
And then we went under the baseboard!  Uncouplers!  Homemade electromagnets, using Peco uncoupler arms.  So far I’ve made 12, and installed 6, and will most likely require at least another dozen.  With current deadline in mind, Peco will have to suffice, but it does limit what I can and can’ shunt.  Our group meeting on sat we were discussing DG’s, so will need to follow that up some more.
- 10 down, how many to go?




Wednesday 4 March 2015

Sturminster Newton - Landscaping - part 2


It’s been a fairly productive this week, I think.  The signal box development continued, but came to a standstill when I couldn’t find some steps I had tucked away.  I’ve since ordered some more and they are winging their way from Ol’Blighty as you read this.  No doubt the original will appear about 5mins before the postie arrives with the new ones!
I commenced playing with the cobblestone roller I acquired from Shapeways.  It has been a series of trial and error. Development was as follows:
1.       Roll DAS clay onto MDF base with a thin strip of PVA.  This was rolled fairly thin, 2-3mm thick.  This was then allowed to dry.  The results were not good, cracking.
After having spent some time concreting, for the next two efforts I used some boxing. 
2.       This was rolled clay, which was set between to wooden formers (Star Bucks coffee stirrers, approx. 5-7mm high).  No glue this time, which resulted in the bowing once the clay dried.
3.       Again using formers, but some 2mm craft strips (model ship building).  Again no glue, but less bowing.  Both attempts had some shrinkage.
Some talking with the Thursday night UFO mob suggested that the surface be sealed to prevent the moisture from the clay being absorbed.
4.       Sealed surface (undercoat and gloss finish), 2mm formers and PVA to hold the clay.  This is the best result so far, I even painted it.  Just need to measure the spacing of the formers to prevent the roller slipping and varying the height.
 - Test results, L-R, 1-4
 
- close-up of tests 3 and 4 and the roller itself.
 

While this was going on the landscaping continued.  The plastering continued and then the static grass application began.  I’ve only got a home-made one, but it does the job.  I’ve only zapped myself once, so far!
- looking towards the station .

- looking from Stur.
I also managed to finally secure the station platform to the base board, after only 4 years.  This required some test adjustment, as the new Farish Duchess would not clear it.  I had to go digging around my many boxes of stuff, the horde, to find all my supplies of flock, static grass, and other scenic material.  It’s amazing what you have acquire and forget about.  The only thing I’ve had to buy this week was some bolts to secure the village baseboard.  Was most pleased with the rose hedges I picked up somewhere.

- Roses will need some pruning.