Tuesday, 17 March 2015

Sturminster Newton - Landscaping - part 4

Just a quick update.  Got lights, comprising:

  • 25mm PVC pipe with T-pieces and 90° angle elbows,
  • 4m of LED strip and associated powerpack, and
  • Trial and error.
All need to do now is tidy it up, add some connectors, paint and make it ease of use for transport.
- view from Butts pond.


3 comments:

  1. you have made great advances this year. From the photos it is looking nearly completed. Not sure how you have found the time but great work. I have a day tomorrow helping with a layout in Sydney. I think we are ballasting. Should be good fun!!

    ReplyDelete
  2. yes, leave is running out and greg and Kevin are committing me to take Stur to the Toowoomba show this year.

    ReplyDelete
  3. That is looking great Neb! I didnt realise how sizeable the layout was until I saw the pictures in this blog post. Its going to look brilliant with some nice long trains trundling past, you have got lots of depth to the layout which to me really gives a sense of a railway in the landscape.

    Julia :o)

    ReplyDelete